Pipeline Central Construction Information

Contractor:
Whitaker Contractors, Inc.

Construction Manager:
Jacobs Engineering Group, Inc.

Office Phone:
Paso Robles Office: (805) 434-0601

Emergency Phone:
Debra Arbogast : (805) 279-0459
Greg Arbogast : (805) 231-8212
Ed Weyrauch: (619) 618-5926


Pipeline Central Description
 

The Nacimiento Water Project Pipeline Central is the central portion of the transmission line that will deliver raw water from Lake Nacimiento to the Project’s participants. Its alignment commences just south of Paso Robles at the Paso Robles Turnout on Santa Ysabel Road, continues south through Templeton and the east side of Atascadero and ends at the Rocky Canyon Tank and Pump Station in south Atascadero on Rocky Canyon Road. The Pipeline Central consists of five main parts:

Pipeline. Approximately 11 miles of 24-inch to 18-inch diameter ductile iron pipeline will be installed as the central portion of the Project’s pipeline. Pipeline work includes trenching, pipeline installation, and backfilling; sheeting, shoring and bracing; performance of trenchless construction at road and highway crossings; application of pipeline linings and coatings; installation of appurtenances and corrosion monitoring stations; pavement restoration; traffic and pedestrian control; protection and location of existing utilities; hazardous materials removal and disposal; and site restoration.

Turnouts. Three turnouts will be constructed to deliver water from the Project’s main pipeline to to the City of Paso Robles, Templeton Community Services District (TCSD), and Atascadero Mutual Water Company (AMWC). The Paso Robles Turnout is located just south of Paso Robles on Santa Ysabel Road and consists of approximately 3,100-feet of 24-inch diameter ductile iron and welded steel pipeline with one horizontal directional drilling (HDD) river crossing. The TCSD Turnout is located in Templeton off of Templeton Road and consists of approximately 3,950-feet of 8-inch diameter ductile iron and welded steel pipeline with one HDD river crossing. The AMWC Turnout is located just northeast of Atascadero off of Templeton Road and consists of approximately 2,300-feet of 18-inch diameter ductile iron and welded steel pipeline with one HDD river crossing. Each turnout also consists of turnout facility construction, including installation of flow meters, isolation valves, flow control valves, and electrical and instrumentation and control systems.

Horizontal Directional Drilling (HDD). Four HDD river crossings will be performed beneath the Salinas River: one located at the Paso Robles Turnout, having an approximate length of 1,930-feet and an approximate depth of 94-feet; one located just south of Santa Ysabel Road, having an approximate length of 3,000-feet and an approximate depth of 167-feet; one located at the TCSD Turnout, having an approximate length of 860-feet and an approximate depth of 45-feet; and one located at the AMWC Turnout, having an approximate length of 1,060-feet and an approximate depth of 52-feet.

Fiber Optic Cable. A fiber optic communication line will be installed along the entire pipeline alignment for the purposes of Project operations and control. Work will include installation of pull boxes and installation and testing of fiber optic conduit and cable.

Templeton Road Realignment. An approximate half-mile stretch of the northern portion of Templeton Road will be realigned to improve traffic safety. This work includes demolition, grading, paving, and utility relocation.

 

 