The current Project Summary Report (shown by date on the left) contain the program schedule, photos, work completed, and budget for the current phases of the project. Current progress photos from the project are shown below. Please click the photo to enlarge.

Intake:
JW Fowler Co.

URI

wall_liner drill prep_to_drill
  Set to grade entry portal seal Placing last shaft wall liner Prepare to drill and install PS-4 pre-cast piles Prepare to mobilize out to lake from shore

Facilities:
Mountain Cascade, Inc.

RC_pumpcans wore_site Preparing Cuesta Tank Site Preparing Rocky Canyon Pump Station Site
  Rocky Canyon pump cans Rocky Canyon work site Preparing Cuesta Tank Site Preparing Rocky Canyon Pump Station Site

Pipeline North:
Teichert Construction

Trenching along South River Road South River Road trench north of Charolais Road Trench South River Road north of Charolais Road  Welded 20 ft pipe sections for South River Road
  Trenching along South River Road South River Road trench north of Charolais Road Trench South River Road north of Charolais Road  Welded 20 ft pipe sections for South River Road

Pipeline Central:
Whitaker Construction

Feeding pipe at Middle River Crossing John Hollenbeck at Middle River HDD pipe pull Pipe pull at Middle River Crossin Pipe pull operation at Middle River Crossing
  Feeding pipe at Middle River Crossing John Hollenbeck at Middle River HDD pipe pull Pipe pull at Middle River Crossing Pipe pull operation at Middle River Crossing

Pipeline South:
Southern California Pipeline

receiving pit Halcon Road west side of El Camino Real at bore pit location Halcon Road bore pit Working west side of Hwy 101
  Receiving pit Halcon Road West side of El Camino Real at bore pit location Halcon Road bore pit Working west side of Hwy 101